PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing duct work at the 1st Floor Facing North (800x600).jpg Installing Top track at the 3rd Floor Facing East (800x600).jpg Metal Clips around the perimeter of the roof (South Elevation) (800x600).jpg Metal clips aroung the perimeter of the 3rd Floor Facing West (800x600).jpg Patching of Stair -2 (800x600).jpg Patching Stair -2 (800x600).jpg Roof perimeter without the steel plates to support the metal decking (800x600).jpg Started installing duct work at the 1st Floor Facing South-East (800x600).jpg Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600).jpg
Previous pageNext page Patching of Stair -2 (800x600)
Patching of Stair -2 (800x600)